- Home
- slideshows
- miscellaneous
- I traveled to the American Dream megamall on opening day and it was an unexpected breeze
I traveled to the American Dream megamall on opening day and it was an unexpected breeze
I left my office in Manhattan's Financial District at around 9:40 am on Friday, October 25.
From there, I headed to the subway at Fulton Street with plans to take the A or C train uptown to Port Authority.
The C train came first, so I got on board the semi-crowded train and made my way to Midtown.
Once I got to 42nd Street, I followed the signs to Port Authority.
After some maneuvering to the building next door, I made it Port Authority and began to look for the New Jersey Transit.
I bought an $18 round-trip ticket from the New Jersey Transit window for the 355 Express Bus to the American Dream, a line that the New Jersey Transit opened specifically for transportation to the mall.
A ferry from Manhattan to the mall would be opening a few days later, so the bus would have to do for today.
Source: NJ.com
The express bus was scheduled to leave every half an hour. I was told to head to Gate 305 for the 10:30 am bus, so I followed the appropriate signs.
Once at the gate, I was surprised to find hardly anyone in line. I expected to see a huge crowd heading to the megamall on opening day, but there were only about four people in line.
The bus came on time and we boarded with plenty of extra space.
In fact, the bus was almost entirely empty. Still, the few of us on board were excited to see the what American Dream had to offer.
The ride to New Jersey was short, probably around 15 minutes in total. As we approached the complex, I saw a lot of areas still in the midst of construction.
We drove around the massive center for a bit until we reached the drop-off point near the front of the mall.
From there, we boarded a complimentary shuttle to take us the few extra feet to the parking garage and the entrance to the center.
Though devoid of stores, the corridors of American Dream looked mostly finished. But for the most part, there wasn't much to see.
A lot of the mall was in construction, likely in preparation for the final stages of opening.
After walking through some corridors, I made it to the complex's ice-skating rink, which lived up to my expectations rather well. Still, the mall seemed eerily empty for an opening day.
Next to the ice-skating rink, a large window revealed the unfinished DreamWorks Animation water park, which is expected to open on November 27. The park looked like it had a long way to go before completion.
Though most of mall was not yet opened, there were some seasonal decorations lining the corridors that were a nice touch. The Halloween-themed decorations did a lot to liven up what could have been an endless stream of empty white hallways devoid of shops.
Next, I stopped by the Nickelodeon Universe theme park, which was mostly filled with friends and family of the owners and creators of the mall.
The park was filled with rides of multiple thrill levels, from roller coasters to merry-go-rounds. Each ride was based on a different character or show from Nickelodeon.
To get back to Manhattan from the mall, I took the 2:00 pm express bus from the place I was dropped off and found it pretty empty.
I was one of just a few passengers on the bus back to Manhattan. The driver said he hadn't had more than about 16 people on his bus in total that whole day, which I thought was pretty low for the opening day of one of the largest malls in America.
The rest of American Dream has yet to open, so the crowds might just be holding out until they can come and do everything the massive complex is promising. Luckily, the plethora of options available for travel makes getting to the megamall a no-brainer.
Popular Right Now
Popular Keywords
Advertisement