The
The rocket was designed to ferry cargo to the International
Today's launch was scrapped because of a detached "umbilical" cord that connected two of the rocket's stages. The cord carries power from the launch pad to the rocket, and disconnects on launch.
In this case, the rocket suffered from "premature cord drop off."
The launch was scrapped around 4:45 pm EDT, about 12 minutes before the rocket was planned to blast off.
The umbilical on the second stage was the issues that caused the #Antares launch delay. More info as soon as we can evaluate available data.
— Orbital Sciences (@Orbital Sciences) April 17, 2013
Astronomy student Chris Calubaquib posted this image of the detached umbilical cord: