According to officials, the workers are expected to be pulled out from the collapsed tunnel today.
The workers have been trapped since November 12, when the under-construction tunnel from Silkyara to Barkot got blocked due to debris falling in a 60-meter stretch on the Silkyara side.
The operation to rescue 41 workers trapped inside a
As of midnight, rescue teams had said that about 10 metres of debris separated them from the trapped workers.
According to rescue teams, the operation involved drilling through the debris to push wide pipes for the trapped workers to walk out through. The auger machine, which drills through about 3 metres of debris in an hour, had earlier hit a metal obstruction.
A 41-bed hospital readied at the
Rescue workers said the workers would go through a detailed medical examination once they reached the hospital.
Earlier in the night, NDRF personnel also carried oxygen cylinders at Uttarkashi's Silkyara tunnel to assist in the ongoing rescue operation.
The area of entrapment, measuring 8.5 meters in height and 2 kilometres in length, is the built-up portion of the tunnel, offering safety to the labourers with available electricity and water supply. (ANI)