125mm smooth bore gun barrel for T-72 & T-90 tanks with missile firing and improved ammunition
The common barrel system and ammunition for existing T-72 & T-90 tanks needs to be upgraded. Development of ammunition to provide capability of penetration and missile firing capability with these barrels also required to be developed together. Thousand of these will be made and the prototype and trial should be done by 2019. Production & supply by Dec 2020.
1000HP Engine with associated peripherals for T-72 Tank
The power to weight ratio needs to be upgraded from the existing 17hp/ton. There is a need to integrate a newly developed power pack with associated peripherals in T-72. These will also be made minimum 1000 in number and the prototype development & trial evaluation is expected to be by 2018. Production & supply by December 2019.
Individual Under Water Breathing Apparatus (IUWBA) for T-90 Tank
T-90 tanks have an ability to undergo deep fording at 5 meters depth under water channels of upto 5 knots. During deep fording, there is no alternative for the crew to escape from the fighting/driver compartment and reach the surface of the water, before the tank is completely flooded. IUWBA will ensure complete safety of the T-90 tank crew and ensure survivability. The tentative quantity is 10,000 and timeline for induction is two to three years.
Environmental Control Unit– for T-90 Tank
This equipment is highly sensitive to adverse weather & dust conditions and get degraded under extreme heat and dust. There is thus an imperative requirement of an Environmental Control System for T-90S/SK tanks to avoid detrimental effect to the onboard electronics and opto-electronics. The tentative quantity is 2108 and should be inducted within two to three years.
next slide will load in 15 secondsSkip AdSkip AdAuxiliary Power Unit (APU) for T-90 Tank
The engine of the tank T-90 is the main source of power for any function, however it is imperative to have an alternate source of power. It is essential to install an APU (Diesel Generator), which would preserve the main engines life without compromising on the operational capability of the tank T-90. The tentative quantity is 2108 and should be inducted within two to three years.
Tracked Light Dozer (TLD)
This is envisaged as an earth moving plant to be employed by the Indian Army Units in mountainous terrain for a variety of earth moving tasks such as track construction, levelling, land slide clearance & snow clearance etc. The quantity to be procured is around 180 with anticipated requirement and should be ready within two to three years.
Mechanical Mine Layer (Self Propelled)
Equipment is envisaged to lay anti-tank bar mines and its variants in plains, semi-deserts and desert terrain. The quantity to be procured is 239 with complete repair and overhaul support. The tentative timelines are two-three years.
Mechanical Minefield Marking Equipment (Mk-II)
Equipment is envisaged to mechanically erect perimeter fence for marking minefields in plains, semi-deserts and desert terrain. The quantity to be procured is 239 with complete repair and overhaul support. The tentative timelines are two-three years
Self-Propelled Mine Burier (SPMB)
Equipment is envisaged to lay anti-tank mines in plains, semi-deserts and deserts terrain. The quantity to be procured is 239 with complete repair and overhaul support. The tentative timelines are two-three years.
next slide will load in 15 secondsSkip AdSkip AdAssault Track Way- Class 24
This is envisaged as a light weight track material to be employed in Desert/ Semi Desert terrain for mobility of wheeled vehicles of the Indian Army with load class up to Class-24. It is proposed to replace the existing Aluminium Alloy based Assault Track Way Class-12. The total requirement will be around 1000 km. Tentative timelines for development/Production are two-three years.
APTA (Advance Pilotless Target Aircraft )
There is a recurring regiment of suitable aerial target systems for providing realistic training to the crews during the annual field firing exercises. The quantity required is around 5 per year and should be developed in two-three years
MEAT (Manoeuvrable Expendable Aerial Target)
Army AD has a variety of weapon platforms to include missiles of varying ranges and Gun Systems. There is a recurring requirement of suitable aerial target systems for providing realistic training to the crews during the annual field firing exercises. The requirement is 50 per year and should be ready within two to three years.
Modern Aircraft Refueling Pump
It needs to be designed to supply fuel, without anti-icing additives to aircrafts from ground tanks/ containers. The tentative quantity to be built is 434 that too within two to three years.
Diesel engine for Boats
Approximately 40 for 2016-17 will be built and tentative timeline for induction is 3 to 5 years.
next slide will load in 15 secondsSkip AdSkip AdUpper Air sounding system
It will generate aviation met reports, assess anomalous propagation conditions, ballistic correction for ammunition firing. Tentative quantity to be procured after successful prototype is 25 units for IN ground station (fixed) and around 14,000 per annum Radiosonde (Consumable) and will be inducted by 24 months
Supersonic Aerial Targets
Minimum altitude 5-20m & max greater than or equal to 1000m. Tentative quantity to be procured after successful prototype development is likely to be around10. Tentative timeline for induction is 4 years.
Targets for Combat torpedo firing
Underwater Expendable Target for Combat Torpedo is easy To Lay/Recover And Transportable By Ship, Target Autonomous Once Laid, Capable Of Seducing Active & Passive Homing Light/Heavy Weight Torpedo. Tentative Quantity to be Procured After Successful Prototype Development is one/ two per year and will be inducted within 4 years.
Deck Winches (for shipping applications)
A self-contained, electro-hydraulic or electro-mechanical, variable speed cable handling system. Stainless steel hardware protected for marine environment. Tentative quantity to be procured after successful prototype development is four. Tentative timeline for induction is 2 years.
Diesel Engines for Propulsion
The Diesel Engines are required for propulsion onboard Ships. The Engines with Power Rating of 5-10 MW are required to be indigenously developed. Tentative quantity to be procured after successful prototype development would be finalised post discussions and based on Induction Plan of Ships for 5-10 MW Power Rating Engines. Tentative Quantities are 15 Per Year 2020 onwards. Tentative timeline for induction 03 To 05 Years
next slide will load in 15 secondsSkip AdSkip AdMI series main & tail rotor blades
The MRB/TRB are fixed components and thus are required to be replaced on life expiry. The MRBs/TRBs are also required to be repaired on damage/defect. Tentative quantity to be procured after successful prototype development 30 to 35 sets of MRBS/TRBs each, per year and tentative timeline for induction 2019 onwards over the next 25 years.
Air to Ground Rockets
The rockets are proposed to be developed and manufactured under the ‘Make’ category of the DPP. As a preliminary step, Air to Ground Rockets of 70 mm Calibre are intended to be indigenously developed and produced. Tentative timeline for induction is 2018-21
Chaff & flares
Chaff is a form of volumetric radar reflecting material that is composed of distributed metalized radar reflecting reflector material. Flares are T designed to be effective against infrared (IR Seeking missile). These are proposed to be developed and manufactured under the ‘Make’ category of the DPP. Tentative quantity to be procured after successful prototype development is around 1 lakh Chaffs and 2 lakh Flares per year and tentative timeline for induction would be year 2019 onwards
Long Range Glider Bomb
As a preliminary step, two classes of LRGBs_viz 125 Kg and 500 Kg, compatible with Su-30 MKI aircraft are intended to be indigenously developed and produced. Tentative quantity to be procured after successful prototype development is thousand per year and tentative timeline for induction is as soon as trials are successfully completed